Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /opt/bitnami/apps/wordpress/htdocs/wp-includes/functions.php on line 6114
AAM Tower | Carlos Ott

AAM Tower


An office tower with a dynamic form rises from a 35 metre high parking podium. The architectural composition of this tower is based on the fusion of three triangular base prisms of different heights. The lower prism has a gold glass cladding. The intermediate height prism is embraced by silver glass. The highest prism is covered with an aluminium cladding.

LOCATION: Dubai, U.A.E.
AREA: 101.615 m2
DATE: 2002
STATUS: Completed 2008
DESIGN ARCHITECT: Carlos Ott
ARCHITECT OF RECORD: Arenco

Other Projects