Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /opt/bitnami/apps/wordpress/htdocs/wp-includes/functions.php on line 6114
Celebra Office Building | Carlos Ott

Celebra Office Building


Celebra Building, an emblematic double helicoid 8-storey office building in Zonamerica free zone, rises to celebrate the 2010 Technological Park’s 20th anniversary. Formed by two inverted sliced elliptical conic shapes it achieves the required flexibility for office display, it reaches the highest sets of demands attaining LEED GOLD certification. Celebra Building obtained in London the award for Best Office Building in the World at the International Property Awards, in association with Bloomberg.
The lobby and the bank occupy the ground floor, business centre covers the first level and offices with flexible layout take up the floors above. Conference rooms, the bank lower level, the cafeteria and service areas fill the basement. Penthouse offices with private terraces besides public use terraces with unobstructed views accommodate on the upper floor.

LOCATION: Zonamerica Business Park, Montevideo, Uruguay
AWARDS: International Property Award in association with Bloomberg television:
1st Architecture Award office category for Uruguay,
1st Architecture Award office category for America,
1st International Architecture Award office
LEED 2009 Core and Shell GOLD Certified 2015 USGBC
AREA: 10.324 m2
DATE: 2009
STATUS: Completed 2014
ARCHITECT: Carlos Ott in association with Carlos Ponce de León Architects

Other Projects