Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /opt/bitnami/apps/wordpress/htdocs/wp-includes/functions.php on line 6114
Cte. Armando Tola International Airport – 2nd Phase | Carlos Ott

Cte. Armando Tola International Airport – 2nd Phase


Adjacent to the lake "Lago Argentino", in the region of Patagonia, this airport uses exposed steel structure and high technology equipment in order to create a contrast with the rugged stone of the region, in a dynamic design that emphasizes the majesty of this grandiose area of Argentina. Without a single vertical element, the steel structure is supported by rock clad piers and a steel roof and its transparent curtain wall facade allows for unique views.

LOCATION: El Calafate, Santa Cruz, Argentina
AWARDS: 1st Prize International Design Competition
AREA: 8.300 m2
DATE: 2004
STATUS: Completed 2013
DESIGN ARCHITECT: Carlos Ott
ARCHITECT OF RECORD: Juan Carlo Sabaté - Alberto Radaelli Arquitectos

Other Projects